New building project at AMC in Bingen am Rhein
Project brief:
In Bingen-Kempten, AMC Alfa Metalcraft Corporation has opened a new and central distribution warehouse for all of Europe.
The goal was to set up a simple and ruggedly designed plant featuring optimum use of space. Thanks to optimised routing within the site and a clear-cut process structure, employees can work flexibly and maximum flexibility for the plant's overall output is also ensured.
At the heart of the site is a new picking centre, which has been incorporated into the existing building.
Project specifications
- 60 drive systems, 12 scanners
- Pools in the control units for tote routing
- Interfaces to automated strapping and bonding machines
- ID point with tote and order entry