New building project at AMC in Bingen am Rhein

Project brief:
 
In Bingen-Kempten, AMC Alfa Metalcraft Corporation has opened a new and central distribution warehouse for all of Europe.

The goal was to set up a simple and ruggedly designed plant featuring optimum use of space. Thanks to optimised routing within the site and a clear-cut process structure, employees can work flexibly and maximum flexibility for the plant's overall output is also ensured.

At the heart of the site is a new picking centre, which has been incorporated into the existing building.
 
Project specifications

  • 60 drive systems, 12 scanners
  • Pools in the control units for tote routing
  • Interfaces to automated strapping and bonding machines
  • ID point with tote and order entry

Image gallery


Back to overview